35 Contoh Soal Descriptive Text, Bisa Jadi Referensi Belajar Bahasa Inggris
The bridge was built by a consortium of Indonesian companies PT AdhiKarya and PT WaskitaKarya working with China Road and Bridge Corp. and China Harbor Engineering Co. LtD. The total cost of the project, including connecting roads, has been estimated at 4.5 trillion rupiah (US$445 million).
Construction was started on August 20, 2003. In July 2004, a girder collapsed, killing one worker and injuring nine others. Work on the bridge halted at the end of 2004 due to lack of funds, but was restarted in November 2005. The main span of the bridge was connected on March 31, 2009, and the bridge was opened to the public in June 10, 2009.
Within a week of the opening, it was discovered that nuts and bolts as well as maintenance lamps had been stolen and that there was evidence of vandalism of cables supporting the main span.
13. Suramadu’s bridge also known as….
A. Longest bridge
B. sura and madu
C. Surabaya-Madura bridge
D. toll bridge
E. cable bridge
Jawaban: C
14. Suramadu’s bridge connects the island….
A. Java and Sumatra
B. Java and Bali
C. Sumatra and Kalimantan
D. Java and Madura
E. Java and Surabaya