35 Contoh Soal Descriptive Text, Bisa Jadi Referensi Belajar Bahasa Inggris 

Wikku D Nugroho
Contoh Soal Descriptive Text (Freepik)

The bridge was built by a consortium of Indonesian companies PT AdhiKarya and PT WaskitaKarya working with China Road and Bridge Corp. and China Harbor Engineering Co. LtD. The total cost of the project, including connecting roads, has been estimated at 4.5 trillion rupiah (US$445 million).

Construction was started on August 20, 2003. In July 2004, a girder collapsed, killing one worker and injuring nine others. Work on the bridge halted at the end of 2004 due to lack of funds, but was restarted in November 2005. The main span of the bridge was connected on March 31, 2009, and the bridge was opened to the public in June 10, 2009.

Within a week of the opening, it was discovered that nuts and bolts as well as maintenance lamps had been stolen and that there was evidence of vandalism of cables supporting the main span.

13. Suramadu’s bridge also known as….

A. Longest bridge
B. sura and madu
C. Surabaya-Madura bridge
D. toll bridge
E. cable bridge

Jawaban: C

14. Suramadu’s bridge connects the island….

A. Java and Sumatra
B. Java and Bali
C. Sumatra and Kalimantan
D. Java and Madura
E. Java and Surabaya

Editor : Komaruddin Bagja
Artikel Terkait
57 tahun lalu

35 Soal Bahasa Inggris Kelas 4 Semester 1 Beserta Jawaban

57 tahun lalu

52 Contoh Soal UAS Bahasa Inggris Kelas 12 Semester 1

57 tahun lalu

Jokowi Bicara Revolusi Besar Robot dan AI di Bloomberg New Economy Forum: Waspadalah!

57 tahun lalu

Prabowo Ingin Datangkan Guru dari Selandia Baru, Ajarkan Calon PMI Bahasa Inggris

Berita Terkini
Network
Kami membuka kesempatan bagi Anda yang ingin menjadi pebisnis media melalui program iNews.id Network. Klik Lebih Lanjut
Network Updates
News updates from 99+ regions
Personalize Your News
Get your customized local news
Login to enjoy more features and let the fun begin.
Kanal